Space X Data Center Dry Cooling
Questions Regarding Dry Cooling and Water Use
A company called Tombstone Resources has applied to build a computing campus near the Willcox Playa in Cochise County that could use up to about 6 gigawatts of electricity at full build-out, according to the application itself (Application, p. 48). SpaceX, which told a community meeting it owns the project, has said it will use zero industrial water for the life of the project (SpaceX, November 4, 2026 community meeting). But nearly all the electricity a computing campus this size draws ends up as heat that has to be removed somehow, usually with water, power, or both (ACEEE, Guidehouse study). This article explains, in plain terms, why the county should ask hard questions about whether that promise can hold, before approving the project, not after.
Why this matters
The site sits in a groundwater basin that the state’s own water agency has called one of the three most stressed in Arizona (ADWR, Oct. 3, 2024). How this facility cools itself decides whether it leans on water from that basin, on extra electricity from the grid, or on slowing its own computers down during the hottest weather. The county can only hold the project to these types of details by writing them into the approval as an enforceable condition (Cochise County Zoning Regulations §§ 2.48.160(3)(e), 2.51.240(6)). A narrative promise, or one made at a community meeting, does not carry forward if the project changes hands or the people who made it move on.
Three ways to get rid of heat
Think of the cooling system as having three dials, and the applicant can turn any of them up when the weather gets hot:
- Water. Spray water onto the cooling equipment, or run a cooling tower. Evaporating water removes heat efficiently, but it consumes the water rather than just borrowing it (Uptime Institute).
- Electricity. Run mechanical refrigeration, the same basic principle as a home air conditioner, to cool the system below what the outside air alone could do. This uses more power, especially on hot days (APM Research Lab).
- Computing speed. Let the equipment run warmer and slow itself down, known as throttling, so it generates less heat in the first place (ASHRAE research project 1972).
The applicant’s plan is to rely mainly on simple fan-cooled equipment, called dry coolers, which uses no water in normal operation but loses effectiveness as the outside air gets hotter (Application, p. 31). It keeps a water-spray option in reserve for the very hottest hours. The problem is not that any of these three options is unreasonable. It is that the application does not say, with real numbers, how often each one would actually be needed, or what happens when dry cooling alone is not enough.
Two companies, two different promises
It matters who said what, because only one of them signed the application.
Tombstone Resources, the applicant, wrote in its filing that the project is “closed liquid loop” cooling with no cooling towers and no evaporative spray in normal operation (Application, p. 9), but kept a small spray reserve for the one or two hottest hours of the year (Application, pp. 31 to 32). SpaceX, which told a community meeting it owns the project, has gone further in public than the application does on paper, saying there will be no evaporative spray (SpaceX, archived) and zero industrial water use for the life of the project (SpaceX, November 4, 2026 community meeting).
Those are not the same commitment. SpaceX’s public statement is not part of the application, and nothing in the application binds SpaceX to keep it. If the county wants a no-spray guarantee, it needs to be written into the approval as a condition, not assumed from a statement made at a meeting.
“Closed loop” does not mean “no water”
A closed loop just describes the pipes: the liquid that carries heat away from the computers stays sealed inside them and circulates again, rather than being dumped. It says nothing about what happens once that heat reaches the equipment outside, which is where water use is actually decided. The same closed loop can send its heat to plain fan-cooled equipment that uses no water, or to spray-assisted coolers or cooling towers that use a lot, by evaporating it (Lawrence Berkeley National Laboratory, p. 41).
A closed loop also has to be filled in the first place, and topped off as water is lost over time, and that first fill and topping-off is itself a meaningful amount of water, separate from any spray (Application, pp. 31 to 32). So hearing a company call its system “closed loop” tells you almost nothing about how much water it will use. The real question is what the outdoor equipment does with the heat, and the application does not spell that out as clearly as it should.
A small-sounding number that is actually huge
The application’s own spray estimate shows why a single annual figure can be misleading. It describes about 1.25 million gallons a year for the full campus (Application, p. 32), which sounds modest next to the thousands of acre-feet a conventional cooling-tower data center would use. But the application also says this water would be used in just the one or two hottest hours of the year, not spread evenly across the year.
Do the arithmetic on the applicant’s own numbers, and that works out to roughly 625,000 to 1.25 million gallons in a single hour, depending on whether it is one hour or two. That is on the order of 125 to 250 tanker trucks’ worth of water, delivered within a single hour or two, not spread evenly across the year. The application does not say where that water would come from on short notice, how much would need to be stored on site ahead of time, or how fast it could actually be delivered. Those are ordinary engineering questions and the application simply does not answer them.
No one has done this before, at this size, in this climate
It would help to point to another data center already running on fans alone in a hot desert climate, at a comparable scale, and say “it works, here is the proof.” That data does not seem to be publicly available. The hot-climate data centers whose cooling is publicly described, in and around Phoenix, all appear to use either refrigeration or evaporative cooling for at least part of their operations, not dry coolers alone (QTS’s DC1 data sheet; Google, per Axios). Even Microsoft, which is moving toward air-cooled chillers for its future buildings in the area, still uses direct evaporative cooling with real water use at its existing ones (Microsoft).
This is not a contradiction of what the applicant proposes. Dry coolers are standard, proven equipment, and newer computer chips are increasingly designed to tolerate warmer water, which helps dry cooling work in more climates (NVIDIA; ACHR News). But the proposed campus would be many times larger than the biggest facility discussed here. Operators do not always publish their equipment, so a site that truly runs dry-cooler-only may exist. The applicant should therefore show the engineering behind that claim, rather than asking the county to take it on faith.
Yesterday’s weather, not tomorrow’s
The applicant’s figures are based on a historical temperature record for the area, not a projection of future conditions. The applicant estimates its cooling loop runs above its design temperature about 180 hours a year, and reaches the equipment’s upper limit for one to two hours a year (Application, Water Narrative). Our own count of hourly weather records near the site from the University of Arizona’s AZMet Willcox Bench station, covering 2019 through 2026, shows how much a single “typical year” figure can hide: the number of hours above 90 degrees in a given summer ranged from 311 to 769, more than double from the mildest year to the hottest. A figure like “about 180 hours a year” or “one to two hours a year” near the equipment’s limit is really an average that swings a lot depending on the year.
On top of that year-to-year swing, the federal government’s own climate assessment projects more days above 86 degrees and more summer heat waves across the Southwest in the years ahead (Fifth National Climate Assessment, Ch. 28). The application does not say whether its cooling design includes any margin for a hotter future, which matters for a facility expected to operate for years or decades, not just one summer.
The questions, and why each one is reasonable to ask
- What exact equipment, running at what temperatures, checked by whom? The application does not name the dry cooler make or model, the manufacturer’s performance curves, or the design and upper-limit coolant temperatures the one-to-two-hour estimate is based on. Without those figures, and without them being open to independent review, nobody outside the company can check whether that estimate is realistic, rather than optimistic. Most applications would not need to spell this out, but here it matters for the water question too: how evenly air reaches every rack, and whether parts other than the main processors stay within their own limits, affects how often the system has to fall back on spray to cool a hot spot. Industry guidance recommends keeping this kind of equipment at around 64°F to 81°F for best reliability, well below the site’s summer highs (TechTarget, summarizing ASHRAE’s Thermal Guidelines for Data Processing Environments). The application does not address any of this.
- What happens for a full year, hour by hour, not just on one hot afternoon? Our own count of hourly weather records found 2023’s hottest stretch held at or above 95 degrees for 25 straight days, though no run at or above 100 degrees lasted more than 7 hours, and nights cooled back to 71 to 80 degrees even after the hottest days (our count, AZMet Willcox Bench station). That is not proof the design would fail. It is a reason to ask for the applicant’s own hour-by-hour analysis across a full year, not just a single hot-afternoon estimate.
- Which happens when dry cooling alone falls short: warmer computers, or spray? The application does answer part of this: on the hottest days, it says the loop “is allowed to rise a few degrees and the computing equipment runs slightly warmer” instead of spraying (Application, p. 31). But it also keeps a water-spray option in reserve (Application, p. 32) without saying which happens when, or what decides between them.
- Could the campus’s own waste heat raise the air its coolers have to work with? Large clusters of outdoor cooling equipment can recirculate their own hot exhaust air, especially with many units packed close together, which would make the real-world temperature the equipment faces higher than the official weather report (Khankari, “Optimum Placement for Air-Cooled Chillers,” ASHRAE Journal, January 2016). A 2026 peer-reviewed study measured a broader version of this effect at four real data centers in the Phoenix area, the largest at 169 megawatts: waste heat raised downwind air temperatures by an average of 1.3 to 1.6 degrees, and by as much as 4 degrees, for about a third of a mile from the facility (Sailor et al., Journal of Engineering for Sustainable Buildings and Cities, 2026). The proposed campus would be many times larger than any facility in that study. Whatever hour-by-hour or heat-plume modeling the county requires should account for this kind of self-warming as an input, not rely only on the historical, undisclosed weather record the applicant has used so far.
- Can the water system actually deliver the implied rate in an emergency hour, not just the yearly total? As shown above, the annual spray figure implies hundreds of thousands of gallons an hour. That is a very different engineering problem than an average daily use figure, and the application does not show it has been solved.
- Are SpaceX’s public promises and the applicant’s spray reserve actually the same commitment, or two different things? As explained above, they are not the same, and only one of them is part of the application the county is reviewing.
- Does the plan account for a hotter future, not just the last several summers? Climate projections for the region point toward more extreme heat, not less, over a facility’s likely operating life.
None of these questions assumes the project cannot work. They are the same kind of questions any engineer reviewing a large cooling system would expect to see answered before signing off, and the application leaves each one open.
Why these need to be conditions, not promises
County zoning rules let the commission attach reasonable requirements, including water conservation measures, to a special use approval, and those conditions run with the land (Cochise County Zoning Regulations §§ 2.48.160(3)(e), 2.51.240(6)). A statement in the application’s narrative, or a promise made at a public meeting, does not bind the project once it is built and operating; only a condition written into the actual approval does, and only if it comes with a real consequence for not meeting it.
Bottom line: The question is not whether this kind of computer can be cooled. It can be. The question is whether this specific design, at this specific size, in this specific desert climate, can do it without relying on amounts of water or electricity that nobody has quantified. The applicant has not shown that work, and the county has good reason to require it before approval, not after.